Multifunction Bridge WALLTEQ M-300/M-500 insuFill
Multifunction Bridge WALLTEQ M-300/M-500 insuFill
Your Solution for automated insulation.
With the WALLTEQ M-300 / M-500 insuFill, you can automatically insulate your timber construction elements such as external walls, roof and floor elements, gable triangles or special elements. The CNC-controlled multifunction bridge accurately moves the insulation plate over the respective frame work compartment. Through the digital interface, all data such as position, shape and size are stored in the CAD and then transferred to the insulation plate.
Benefits
Images
Features
-
fastenerSwitch
The first quick change system for fastening units -
Positioning of the blow-in plate with utmost precision above the respective frame work compartment
-
Automatic data transfer (position, shape, size) from all established CAD programs
-
Easy operation with the intuitive user interface powerTouch
-
Increased flexibility with regard to insulation material: cellulose, wood fiber, mineral wool and much more are possible
-
Simplified workflows and space savings through optimized logistics
-
There are 2 options available for different performance requirements:
- WALLTEQ M-300 insuFill: Integrated in production lines as a pure insulation station - ideal for small and medium-sized companies. Roof and ceiling elements can be automatically insulated with the optional rotatable insulation plate by 90 ° (available in both manual or pneumatic control).
- WALLTEQ M-500 insuFill: fully automatic insulation, fastening and machining in one machine. Ideal for use with medium-sized companies and industrial customers alike.
Various machining and fastening options are available, such as drilling, sawing, milling, marking, labeling, screwing, clipping and nailing.
Technical Data
Max. element width [mm] | 3,200 optional: 4,200 |
Max. element height [mm] | 500 |
Max. element length [m] | customer specific up to 50, or greater lengths possible |
Blow-in power [p / h] | approx. 1,000 (depending on insulation material and element) |
Time required per wall element [min] 10 x 2,7 x 0,2 [m] (length x height x thickness) | 20 (depending on insulation material and element) |
All technical data are without engagement!
(Previous product name: Multifunction Bridge WMS 150 blowTEC)
Videos
Vorfertigung mit der WALLTEQ M-300 insuFill
Einblicke in die Produktion bei der Terhalle Holzbau GmbH